Meeting Report #1
Agency:
PSU/Red Sea Rangers
Interviewed person:
Mr. John McEachern, Team Leader
Date of Meeting:
April 22
nd
, 2002
Participants:
Mr. Ahmed El Ibiary, Legal Consultant
Eng. Salah M. Abdel Razek, Institutional
Development consultant
Purpose of the meeting: Review the scope of work and agree on implementation
schedule and expected out puts.
Main Outcomes:
Mr. McEachern reviewed each task as mentioned in
the TOR to assure the mutual understanding of the
TOR. Each consultant has presented his proposed
methodology to implement the assigned tasks as well
as expected contents of his report.
The major out puts of the meeting could be
summarized in the following:
o
Mr. McEachern approved the expected contents of
the report with advice to abbreviate the details at
the central level putting more contracted level of
effort to the Red Sea Rangers support.
o
Because of the difficulties faced by the consultants
in arranging meetings at the central level due to
prior commitments of Dr. Fouda, it has been
agreed to start the assignment at the Red Sea level
and postpone the coverage of the central level to a
later stage.
o
A quick field visit was arranged to take place on
April 26 30. The scope of visit is to get more
understanding of the local situation and to
identify the main stakeholders. The major
required fieldwork will be arranged for during
the first visit.
38
footer
Our web partners:
Inexpensive
Web Hosting
Java Web Hosting
personal webspace
webspace php
linux webhost
html web templates
DreamweaverQuality Web Templates
PSD Web Templates
cheap webhost
j2ee web Hosting
buy webspace
ftp webspace
adult webspace
frontpage WebHosting
webspace hosting
cheap webhost
Visionwebhosting.net Business web hosting division of Vision Web Hosting Inc.. All rights reserved
frontpage webhosting