Annex b 
Major Meetings  Reports 
Meeting Report #1 
Agency:  
PSU/Red Sea Rangers 
Interviewed person:  
Mr. John McEachern, Team Leader 
Date of Meeting: 
April 22
nd
, 2002 
Participants: 
Mr. Ahmed El Ibiary, Legal Consultant 
Eng. Salah M. Abdel Razek, Institutional 
Development consultant 
Purpose of the meeting: Review the scope of work and agree on implementation 
schedule and expected out puts. 
Main Outcomes:  
Mr. McEachern  reviewed each task as mentioned in 
the TOR to assure the mutual understanding of the 
TOR. Each consultant has presented his proposed 
methodology to implement the assigned tasks as well 
as expected contents of his report.  
The major out puts of the meeting could be 
summarized in the following: 
o 
Mr. McEachern approved the expected contents of 
the report with advice to abbreviate the details at 
the central level putting more contracted level of 
effort to the Red Sea Rangers support. 
o 
Because of the difficulties faced by the consultants 
in arranging meetings at the central level due to 
prior commitments of Dr. Fouda, it has been 
agreed to start the assignment at the Red Sea level 
and postpone the coverage of the central level to a 
later stage. 
o 
A quick field visit was arranged to take place on 
April 26   30. The scope of visit is to get more 
understanding of the local situation and to 
identify the main stakeholders. The major 
required fieldwork will be arranged for during 
the first visit. 
  38






footer




 

 

 

 

 Home | About Us | Network | Services | Support | FAQ | Control Panel | Order Online | Sitemap | Contact

 

Our web partners: Inexpensive Web Hosting Java Web Hosting personal webspace webspace php  linux webhost

 html web templates DreamweaverQuality Web Templates PSD Web Templates

cheap webhost j2ee web Hosting buy webspace ftp webspace adult webspace

frontpage WebHosting webspace hosting cheap webhost

Visionwebhosting.net Business web hosting division of Vision Web Hosting Inc.. All rights reserved

frontpage webhosting